Arlington, VA Kitchen Remodel

This job was designed by DGI Design Group/ Diane Gordy (301-229-9500). The job consisted of a complete renovation to the existing 3 bedroom condo in Arlington, Virginia. The new kitchen was renovated to include new low voltage track lighting and a more contemporary feel. New carpet and tile flooring was also installed.

Arlington, VA Bathroom Remodeling

This job was designed by DGI Design Group/ Diane Gordy (301-229-9500). The job consisted of a complete renovation to the existing 3 bedroom condo in Arlington, Virginia. It included all new large crown molding, wood baseboards, and flush solid core doors. One bathroom was renovated to include a walk in shower, while the other one features a soaking tub. New granite top vanities were included in both bathrooms. New carpet and tile flooring was also installed.

Togo Canopy Project

DRHCI would like to give special thanks to the following companies: Corle Building Systems / Frank Kmetz; T.J. Distributors / Jason Dinan; Precision Installations, Inc. / David Brownson; Taft Construction / Tim Fadorsen; and World Cargo / Gary Schwartz.

Togo Canopy Project

The two canopies were built to provide seating and shade for the President’s special invited guests at Togo, Africa’s 50th year celebration of independence.

Togo Canopy Project

These two buildings, complete with a full set of aluminum bleachers, were constructed for the 50th year celebration of independence for Togo, Africa.

Togo Canopy Project

In Togo, Africa, we had the privilege to work with a local company, BAK Transaction LLC, led by Mr. Amah.

It took us 23 days to complete the project once we arrived in Togo.

Togo Canopy Project

The local laborers in Togo, Africa were provided by one of the local general contractors. They were very eager to help and were quick learners.

Togo Canopy Project

Project for a government event in Togo, Africa as they celebrated their 50th year of independence from France.

↑