Gaithersburg Bathroom Remodel by DRHCI Don Hartman ⋅ Like 0 Thanks! You've already liked this 1 comment « Gaithersburg Bathroom Remodeling by D.R. Hartman Construction One Comment Don Hartman May 20, 2013 @ 1:53 pm This is the soaking tub that was installed. All wall tile was installed full height. Floor tile was run diagonally. All floors have radiant heat controled by a T-stat on the wall. Reply Leave a Reply Cancel replyYour email address will not be published. Required fields are marked *Comment * Name * Email * Website Please enter an answer in digits:seventeen − eight =
May 20, 2013 @ 1:53 pm
This is the soaking tub that was installed. All wall tile was installed full height. Floor tile was run diagonally. All floors have radiant heat controled by a T-stat on the wall.